Welcome to the Trinity construction project page. 

The purpose of this page is to allow mission teams to search for projects that match up with their skill set.

Information includes job details, videos and pictures, drawings when necessary, materials needed and approximate cost of materials.

It is our hope that a team could pick a project, obtain the necessary funds, arrange for their trip and then complete their project.

This page is by no means complete and should be considered as a guideline for future work.

Once your team chooses a project, please contact the project cordinator steve5140@aol.com and he will assign it to you, and post that project has been taken.

Please remember that this is a work in progress and plans and drawings will be made available as they become finished.

It is very important to remember that there are no direct funds available for this project, so fundraising is key.

Several teams are already signing up for projects and I have noted them below.  If you are planning your trip please contact us so we can reserve your project.

Demolition

                1st Floor       Project spoken for  Oct 11th

                2nd Floor      Project spoken for  Oct 11th

                Sidewalk

               Concrete Slab for New Plumbing

Temporary Enclosure      Project spoken for Oct 11th

Relocate Windows

Doorway into Storage Room

Restore Claiborne Exterior     Project spoken for Oct 11th

Support Beams       Project spoken for Oct 11th

Dropped Ceiling

Replace Floor in Choir Loft

Sanctuary Glass Wall

Fire door  (Information will become available once windows are relocated)

Rear Entry Doorway

Framing

                1rst floor  (Information will become available once demolition and ground plumbing is done)

                2nd Floor  (Information will become available once demolition and ground plumbing is done)

                Choir Loft

Masonry

Dormers       One of the four dormers will be done the week of the 18th Still 3 dormers left

Roof Support Wall     Project spoken for CAMP Team  Oct 11th

Roofing    The roofing will be started the week of the 18th but only a small portion around the first dormer will be completed

Plumbing  (Information will become available once pluming riser plan is finalized)

Electrical  (Information will become available once demolition and ground plumbing is done)

Concrete  (Information will become available once demolition and ground plumbing is done)

Soffit Repair

Courtyard

This list was update on 9/9/10 and information including drawings will be added next week